Irwin-01 exploration well

The Irwin-01 exploration well is located on agricultural land 23km east of Dongara. The well straddles the EP320 exploration permit and L1 permit. The Irwin-01 well was completed in May 2015 and reached a target depth of 4,049 metres in four weeks.

The well is designed to target the same potential reservoirs intersected by the Senecio-03 well. The primary targets were the Dongara/Wagina sandstones, which were intersected during drilling operations. During drilling operations, Mitsui E&P’s predecessor AWE announced elevated gas shows were observed.

The drilling rig used for Irwin-01 was demobilised from site and used to drill the Waitsia-01 appraisal well.

Future plans

  • No flow testing is planned for the Irwin-01 well.
  • The well has been suspended.
Irwin-1 well site location.

Irwin-01 well site location.

 

Drilling operations at the Irwin-1 well site

Drilling operations at the Irwin-01 well site


Denison 3D Seismic Survey

Denison 3D Seismic Survey

The Denison 3D Seismic Survey was the most complicated survey ever done in Australia at the time. Find out more about what was involved in the Denison 3D Seismic Survey.

Drover well head

Drover-01

The Drover-01 exploration well was drilled in mid-2014. Find out more about the current status of Drover-01.

Woodada gate

Woodada Gas Field

Woodada Deep-1 was drilled in April 2012. It was a deepening of the Woodada-4 well. Find out more about the current status of Woodada Deep-1.

Waitsia-02, Waitsia-03 and Waitsia-04 are appraisal wells

Waitsia-02, Waitsia-03 and Waitsia-04

Waitsia-02, Waitsia-03 and Waitsia-04 are appraisal wells. Find out more about  Waitsia-02, Waitsia-03 and Waitsia-04.